Skip To

  • Skip to content

Page Outlines

Loading...

  • Document Library

IE10 and below are not supported.

Google Chrome Mozilla Firefox

Contact us for any help on browser support

Engage Cobourg
  • Home
  • Municipal Website
  • Why Get Involved?
  • IAP2 Public Participation Spectrum
  • Sign in
  • Register
Engage Cobourg

You are here:

  • Home
  • Waterfront Plan: East Pier

Document Library

  • document icon Staff Report - Waterfront User Needs Assessment and Detalied Design Plan (1.81 MB) (pdf)
  • document icon Presentation Final Report Waterfront User Needs Assessment and Detailed Design (2.7 MB) (pdf)
  • document icon Waterfront User Needs Assessment and Detailed Design Plan (45.6 MB) (pdf)
  • document icon Business Case for Cobourg Harbour and Marina (4.4 MB) (pdf)
  • document icon Waterfront User Needs Assessment and Detailed Design Plan Appendixes (172 MB) (pdf)
  • document icon Staff Report - Award of East Pier Condition Assessment and Reallocation (403 KB) (pdf)
  • document icon Staff Report - Waterfront Plan Design Engineering - East Pier and Campground (707 KB) (pdf)
  • document icon Shoreplan Report - October 22, 2018 (5.79 MB) (pdf)
  • document icon Community Services Division Memorandum_Parks and Recreation Advisory Committee_East Pier_October 15 2019 (31.6 KB) (pdf)
  • document icon Staff Report_Waterfront Plan_Design and Engineering for East Pier and Campground_Consultation Report Back_October 15 2019 (3.62 MB) (pdf)
  • document icon Public Engagement Report_Waterfront Plan_East Pier and Campground_October 15 2019 (1.27 MB) (pdf)