Share Waterfront Plan: East Pier on FacebookShare Waterfront Plan: East Pier on TwitterShare Waterfront Plan: East Pier on LinkedinEmail Waterfront Plan: East Pier link
Consultation has concluded
About the Waterfront User Needs Assessment and Detailed Design Plan Cobourg’s waterfront is a defining part of the town. Previously an industrial port, community and political will has transformed the waterfront into an important community destination focused on recreation, cultural, tourism and the environment. However, this transformation is ongoing. While the industrial past is well hidden, there is still work to be done to address the needs of the community now and in the future.
The Waterfront User Needs Assessment and Detailed Design Plan (Waterfront Plan), which was adopted by Council in 2018, provides the community with a roadmap for creating a beautiful, accessible and sustainable waterfront. The Plan recommends 83 initiatives in 24 projects to enhance Cobourg’s waterfront over a 24-year period. Each project requires Council’s approval, and the repair and enhancement of the East Pier is one of the first projects under consideration.
Project #1: Waterfront Plan - East Pier The East Pier is a popular, year-round destination for residents and tourists. Situated on the east side of the harbour, the main trunk of the pier is 400 metres long and 30 metres wide at its widest point. It is largely unobstructed and features a toe rail along the edge and several seating nodes. The coast guard building and dock are at the north end. At the south end, the pier ends and connects to the breakwater which leads to the lighthouse. However, the pier is showing its age. Having been modified and expanded since 1832, the pier now has structural issues and requires ongoing maintenance and repair to fix sinkholes.
The public engagement objective for the East Pier is to:
Identify the best option for the structural repair of the East Pier
Provide commentary on the nine enhancement initiatives proposed for the East Pier
Brainstorm ideas and develop a vision for the future of the East Pier
We're looking for your feedback: To share your thoughts on the East Pier in respect to both structural repair and enhancement please contribute to the following public engagement opportunities below, including:
1. Complete the Survey (repair options) 2. Join our Forum (enhancement options) 3. Share a Story
CLOSED Thank you to all citizens who participated in our public engagement process for the Waterfront Plan. Please see the News Feed below to follow up on the project conclusion.
About the Waterfront User Needs Assessment and Detailed Design Plan Cobourg’s waterfront is a defining part of the town. Previously an industrial port, community and political will has transformed the waterfront into an important community destination focused on recreation, cultural, tourism and the environment. However, this transformation is ongoing. While the industrial past is well hidden, there is still work to be done to address the needs of the community now and in the future.
The Waterfront User Needs Assessment and Detailed Design Plan (Waterfront Plan), which was adopted by Council in 2018, provides the community with a roadmap for creating a beautiful, accessible and sustainable waterfront. The Plan recommends 83 initiatives in 24 projects to enhance Cobourg’s waterfront over a 24-year period. Each project requires Council’s approval, and the repair and enhancement of the East Pier is one of the first projects under consideration.
Project #1: Waterfront Plan - East Pier The East Pier is a popular, year-round destination for residents and tourists. Situated on the east side of the harbour, the main trunk of the pier is 400 metres long and 30 metres wide at its widest point. It is largely unobstructed and features a toe rail along the edge and several seating nodes. The coast guard building and dock are at the north end. At the south end, the pier ends and connects to the breakwater which leads to the lighthouse. However, the pier is showing its age. Having been modified and expanded since 1832, the pier now has structural issues and requires ongoing maintenance and repair to fix sinkholes.
The public engagement objective for the East Pier is to:
Identify the best option for the structural repair of the East Pier
Provide commentary on the nine enhancement initiatives proposed for the East Pier
Brainstorm ideas and develop a vision for the future of the East Pier
We're looking for your feedback: To share your thoughts on the East Pier in respect to both structural repair and enhancement please contribute to the following public engagement opportunities below, including:
1. Complete the Survey (repair options) 2. Join our Forum (enhancement options) 3. Share a Story
CLOSED Thank you to all citizens who participated in our public engagement process for the Waterfront Plan. Please see the News Feed below to follow up on the project conclusion.
Share What East Pier structural repair option did you select, and why? on FacebookShare What East Pier structural repair option did you select, and why? on TwitterShare What East Pier structural repair option did you select, and why? on LinkedinEmail What East Pier structural repair option did you select, and why? link
Share The Waterfront Plan identified nine initiatives pertaining to the enhancement of the East Pier. Let us know your thoughts on any of them. on FacebookShare The Waterfront Plan identified nine initiatives pertaining to the enhancement of the East Pier. Let us know your thoughts on any of them. on TwitterShare The Waterfront Plan identified nine initiatives pertaining to the enhancement of the East Pier. Let us know your thoughts on any of them. on LinkedinEmail The Waterfront Plan identified nine initiatives pertaining to the enhancement of the East Pier. Let us know your thoughts on any of them. link
Read Further Detail on the Nine Initiatives for the East Pier:
4.1 Structural repairs
• Undertake structural repairs of East
Pier including east breakwater
• Continue to ban pedestrian access to
east breakwater due to safety concerns
and to allow for gathering of migratory
birds
• Weight requirements/capacities
need to be understood in relation to
continuing to host special events, such
as the midway during the Waterfront
Festival
4.2 Seating/lookouts • Provide seating nodes along pier with
view of harbour, downtown and Lake
Ontario
• Provide viewing platform at south end,
appropriate for viewing migratory birds
on east breakwater
• Provide options for shade and
potential plantings
• Configuration to preserve
unobstructed space for events
4.3 Pedestrian walkway • Provide safe and accessible clearway
along east pier from Division Street to
east breakwater
• Provide night lighting for pedestrian
safety
• Provide railing between walkway and
edge of pier 4.4 Infrastructure for charter boats and
deep water docking • Provide opportunities for docking on
west side of east pier
• Investigate options to enhance safety
for pedestrians along west side of pier
by introducing a railing or bollards and
chain to provide separation between
pedestrians and edge of pier.
• Docks to support charter boats
• Include pedestrian ramp access
• Include lighting and security measures
• Consider designated parking area for
users of this facility
• Provide an environmentally friendly fish
cleaning station
4.5 New Coast Guard building* • Work with Fisheries and Oceans on
design/construction of new Coast
Guard administration and station
house
• Provide ramp access from pier to
beach – configuration dependent on
design/location of Coast Guard facility
• Town to work with Fisheries and
Oceans to ensure architecture and
design are in keeping with heritage
aesthetic of Cobourg harbour
• Town may consider contributing
additional funds to project to address
building upgrades to make sure design
is in keeping with local vernacular in
regards to architectural heritage and
design excellence
4.6 Provide food concession, restaurant • Designate pier space for food and
beverage sales – either retrofitted
shipping container(s) or food truck(s)
• Provide power and water to
accommodate vendors
• Provide space for setup of seasonal
washroom facilities
4.7 Light house improvements • Upgrade lighthouse as an icon for the
harbour and marina (e.g., paint and
special programmable LED lighting
which can be tailored to reflect the
season or special events)
• Leave walkway connection closed for
pedestrian safety and to preserve
breakwall as a bird roosting location
• For further details on the importance
of both breakwaters to migratory shore
birds and waterfowl, please refer to
the report prepared by Plan B Natural
Heritage in Appendix H
4.8 Seasonal closure of pier to motorized
vehicles • Restrict motorized vehicular access
during peak season to ensure a safe
pedestrian environment and reduce
potential for street racing
4.9 Electrical upgrades and pedestrian
lighting • Provide electrical upgrades to provide
required lighting and power for special
events
• Coordinate work with structural repairs
and specialty lighting for lighthouse
Share Do you have another ideas for the East Pier? What's your vision? on FacebookShare Do you have another ideas for the East Pier? What's your vision? on TwitterShare Do you have another ideas for the East Pier? What's your vision? on LinkedinEmail Do you have another ideas for the East Pier? What's your vision? link
Waterfront Plan: East Pier has finished this stage
To provide the public with balanced and objective information to assist in understanding the problems, alternatives and/or solutions.
Inform
Waterfront Plan: East Pier has finished this stage
To provide the public with balanced and objective information to assist in understanding the problems, alternatives and/or solutions.
Consult
Waterfront Plan: East Pier has finished this stage
To obtain public feedback on analysis, alternatives and/or decisions.
Consult
Waterfront Plan: East Pier has finished this stage
To obtain public feedback on analysis, alternatives and/or decisions.
Involve
Waterfront Plan: East Pier has finished this stage
The final outcomes of the consultation are documented here and may include a summary of all contributions collected as well as recommendations for future action.
Involve
Waterfront Plan: East Pier is currently at this stage
The final outcomes of the consultation are documented here and may include a summary of all contributions collected as well as recommendations for future action.
Collaborate
this is an upcoming stage for Waterfront Plan: East Pier
To partner with the public in each aspect of the decision, including the development of alternatives and the identification of preferred solution.
Collaborate
this is an upcoming stage for Waterfront Plan: East Pier
To partner with the public in each aspect of the decision, including the development of alternatives and the identification of preferred solution.
Empower
this is an upcoming stage for Waterfront Plan: East Pier
To place final decision-making in the hands of the public.
Empower
this is an upcoming stage for Waterfront Plan: East Pier
To place final decision-making in the hands of the public.