About the Waterfront User Needs Assessment and Detailed Design Plan Cobourg’s waterfront is a defining part of the town. Previously an industrial port, community and political will has transformed the waterfront into an important community destination focused on recreation, cultural, tourism and the environment. However, this transformation is ongoing. While the industrial past is well hidden, there is still work to be done to address the needs of the community now and in the future.
The Waterfront User Needs Assessment and Detailed Design Plan (Waterfront Plan), which was adopted by Council in 2018, provides the community with a roadmap for creating a beautiful, accessible and sustainable waterfront. The Plan recommends 83 initiatives in 24 projects to enhance Cobourg’s waterfront over a 24-year period. Each project requires Council’s approval, and the repair and enhancement of the East Pier is one of the first projects under consideration.
Project #1: Waterfront Plan - East Pier The East Pier is a popular, year-round destination for residents and tourists. Situated on the east side of the harbour, the main trunk of the pier is 400 metres long and 30 metres wide at its widest point. It is largely unobstructed and features a toe rail along the edge and several seating nodes. The coast guard building and dock are at the north end. At the south end, the pier ends and connects to the breakwater which leads to the lighthouse. However, the pier is showing its age. Having been modified and expanded since 1832, the pier now has structural issues and requires ongoing maintenance and repair to fix sinkholes.
The public engagement objective for the East Pier is to:
Identify the best option for the structural repair of the East Pier
Provide commentary on the nine enhancement initiatives proposed for the East Pier
Brainstorm ideas and develop a vision for the future of the East Pier
We're looking for your feedback: To share your thoughts on the East Pier in respect to both structural repair and enhancement please contribute to the following public engagement opportunities below, including:
1. Complete the Survey (repair options) 2. Join our Forum (enhancement options) 3. Share a Story
CLOSED Thank you to all citizens who participated in our public engagement process for the Waterfront Plan. Please see the News Feed below to follow up on the project conclusion.
About the Waterfront User Needs Assessment and Detailed Design Plan Cobourg’s waterfront is a defining part of the town. Previously an industrial port, community and political will has transformed the waterfront into an important community destination focused on recreation, cultural, tourism and the environment. However, this transformation is ongoing. While the industrial past is well hidden, there is still work to be done to address the needs of the community now and in the future.
The Waterfront User Needs Assessment and Detailed Design Plan (Waterfront Plan), which was adopted by Council in 2018, provides the community with a roadmap for creating a beautiful, accessible and sustainable waterfront. The Plan recommends 83 initiatives in 24 projects to enhance Cobourg’s waterfront over a 24-year period. Each project requires Council’s approval, and the repair and enhancement of the East Pier is one of the first projects under consideration.
Project #1: Waterfront Plan - East Pier The East Pier is a popular, year-round destination for residents and tourists. Situated on the east side of the harbour, the main trunk of the pier is 400 metres long and 30 metres wide at its widest point. It is largely unobstructed and features a toe rail along the edge and several seating nodes. The coast guard building and dock are at the north end. At the south end, the pier ends and connects to the breakwater which leads to the lighthouse. However, the pier is showing its age. Having been modified and expanded since 1832, the pier now has structural issues and requires ongoing maintenance and repair to fix sinkholes.
The public engagement objective for the East Pier is to:
Identify the best option for the structural repair of the East Pier
Provide commentary on the nine enhancement initiatives proposed for the East Pier
Brainstorm ideas and develop a vision for the future of the East Pier
We're looking for your feedback: To share your thoughts on the East Pier in respect to both structural repair and enhancement please contribute to the following public engagement opportunities below, including:
1. Complete the Survey (repair options) 2. Join our Forum (enhancement options) 3. Share a Story
CLOSED Thank you to all citizens who participated in our public engagement process for the Waterfront Plan. Please see the News Feed below to follow up on the project conclusion.
Share Motion from Committee of the Whole - Passed on FacebookShare Motion from Committee of the Whole - Passed on TwitterShare Motion from Committee of the Whole - Passed on LinkedinEmail Motion from Committee of the Whole - Passed link
At Cobourg Municipal Council's Regular Council Meeting held on Monday, October 21st the following Motion regarding the Waterfront Plan - Design and Engineering for the East Pier passed:
Share Memos Submitted to Council for Consideration on FacebookShare Memos Submitted to Council for Consideration on TwitterShare Memos Submitted to Council for Consideration on LinkedinEmail Memos Submitted to Council for Consideration link
At Cobourg Municipal Council's Committee of the Whole Meeting on October 15th the following Memos were submitted for Council's consideration:
Waterfront Plan: East Pier has finished this stage
To provide the public with balanced and objective information to assist in understanding the problems, alternatives and/or solutions.
Inform
Waterfront Plan: East Pier has finished this stage
To provide the public with balanced and objective information to assist in understanding the problems, alternatives and/or solutions.
Consult
Waterfront Plan: East Pier has finished this stage
To obtain public feedback on analysis, alternatives and/or decisions.
Consult
Waterfront Plan: East Pier has finished this stage
To obtain public feedback on analysis, alternatives and/or decisions.
Involve
Waterfront Plan: East Pier has finished this stage
The final outcomes of the consultation are documented here and may include a summary of all contributions collected as well as recommendations for future action.
Involve
Waterfront Plan: East Pier is currently at this stage
The final outcomes of the consultation are documented here and may include a summary of all contributions collected as well as recommendations for future action.
Collaborate
this is an upcoming stage for Waterfront Plan: East Pier
To partner with the public in each aspect of the decision, including the development of alternatives and the identification of preferred solution.
Collaborate
this is an upcoming stage for Waterfront Plan: East Pier
To partner with the public in each aspect of the decision, including the development of alternatives and the identification of preferred solution.
Empower
this is an upcoming stage for Waterfront Plan: East Pier
To place final decision-making in the hands of the public.
Empower
this is an upcoming stage for Waterfront Plan: East Pier
To place final decision-making in the hands of the public.