About the Waterfront User Needs Assessment and Detailed Design Plan Cobourg’s waterfront is a defining part of the town. Previously an industrial port, community and political will has transformed the waterfront into an important community destination focused on recreation, cultural, tourism and the environment. However, this transformation is ongoing. While the industrial past is well hidden, there is still work to be done to address the needs of the community now and in the future.
The Waterfront User Needs Assessment and Detailed Design Plan (Waterfront Plan), which was adopted by Council in 2018, provides the community with a roadmap for creating a beautiful, accessible and sustainable waterfront. The Plan recommends 83 initiatives in 24 projects to enhance Cobourg’s waterfront over a 24-year period. Each project requires Council’s approval, and the repair and enhancement of the East Pier is one of the first projects under consideration.
Project #1: Waterfront Plan - East Pier The East Pier is a popular, year-round destination for residents and tourists. Situated on the east side of the harbour, the main trunk of the pier is 400 metres long and 30 metres wide at its widest point. It is largely unobstructed and features a toe rail along the edge and several seating nodes. The coast guard building and dock are at the north end. At the south end, the pier ends and connects to the breakwater which leads to the lighthouse. However, the pier is showing its age. Having been modified and expanded since 1832, the pier now has structural issues and requires ongoing maintenance and repair to fix sinkholes.
The public engagement objective for the East Pier is to:
Identify the best option for the structural repair of the East Pier
Provide commentary on the nine enhancement initiatives proposed for the East Pier
Brainstorm ideas and develop a vision for the future of the East Pier
We're looking for your feedback: To share your thoughts on the East Pier in respect to both structural repair and enhancement please contribute to the following public engagement opportunities below, including:
1. Complete the Survey (repair options) 2. Join our Forum (enhancement options) 3. Share a Story
CLOSED Thank you to all citizens who participated in our public engagement process for the Waterfront Plan. Please see the News Feed below to follow up on the project conclusion.
About the Waterfront User Needs Assessment and Detailed Design Plan Cobourg’s waterfront is a defining part of the town. Previously an industrial port, community and political will has transformed the waterfront into an important community destination focused on recreation, cultural, tourism and the environment. However, this transformation is ongoing. While the industrial past is well hidden, there is still work to be done to address the needs of the community now and in the future.
The Waterfront User Needs Assessment and Detailed Design Plan (Waterfront Plan), which was adopted by Council in 2018, provides the community with a roadmap for creating a beautiful, accessible and sustainable waterfront. The Plan recommends 83 initiatives in 24 projects to enhance Cobourg’s waterfront over a 24-year period. Each project requires Council’s approval, and the repair and enhancement of the East Pier is one of the first projects under consideration.
Project #1: Waterfront Plan - East Pier The East Pier is a popular, year-round destination for residents and tourists. Situated on the east side of the harbour, the main trunk of the pier is 400 metres long and 30 metres wide at its widest point. It is largely unobstructed and features a toe rail along the edge and several seating nodes. The coast guard building and dock are at the north end. At the south end, the pier ends and connects to the breakwater which leads to the lighthouse. However, the pier is showing its age. Having been modified and expanded since 1832, the pier now has structural issues and requires ongoing maintenance and repair to fix sinkholes.
The public engagement objective for the East Pier is to:
Identify the best option for the structural repair of the East Pier
Provide commentary on the nine enhancement initiatives proposed for the East Pier
Brainstorm ideas and develop a vision for the future of the East Pier
We're looking for your feedback: To share your thoughts on the East Pier in respect to both structural repair and enhancement please contribute to the following public engagement opportunities below, including:
1. Complete the Survey (repair options) 2. Join our Forum (enhancement options) 3. Share a Story
CLOSED Thank you to all citizens who participated in our public engagement process for the Waterfront Plan. Please see the News Feed below to follow up on the project conclusion.
Shoreplan Engineering Limited (Shoreplan) was retained by the Town of Cobourg to investigate the condition of the East Pier in Cobourg in response to recent and long-term settlement issues with the asphalt deck on the pier.
It was determined that the pier is beyond its design life and the factors contributing to the settlement issues are related to the age and there will be additional deterioration as time goes on.
Four options have been presented by Shoreplan giving alternatives for retaining all or some of its functions.
Options for repair of the East Pier including cost:
Option 1 - Pedestrian
only. Closed to Traffic. This option involves naturalization of the pier for use as a pedestrian space and closes the
pier to all vehicular traffic. In choosing this option the only permitted use
would be pedestrian traffic. Estimated Cost:
$440,220.00 (plus design fees & taxes)
Option 2 - Predominantly
Light Vehicle Use. This option retains
the current look and use of the pier while addressing settlement issues. Access will be
restricted to pedestrians & light vehicles only. Heavy trucks, lifting operations and carnival
rides would be prohibited. Estimated Cost: $1,091,420.00 (plus design fees & taxes)
Option 3- Limited
Heavy Use, Along with Pedestrian and Light Vehicle. This option creates a stable concrete deck within the existing footprint for
heavier use along a 10-metre wide concrete deck that could allow
movement of boats in/out of the marina. The remaining footprint of the pier
could be naturalized for pedestrian access. Estimated Cost: $3,795,660.00 (plus design fees & taxes)
Option 4 – Predominantly
Pedestrian withLight Vehicle Use. This option involves a combination of Options 1 & 2 and allows for light vehicle use on
the west side of the pier and pedestrian use only on the remaining portion of the pier. Estimated Cost: $719,180.00 (plus design fees & taxes)
The Town of Cobourg is asking citizens to express their preference towards one of the four repair options below.
Consultation has concluded
Share Cobourg's East Pier Repair Options on FacebookShare Cobourg's East Pier Repair Options on TwitterShare Cobourg's East Pier Repair Options on LinkedinEmail Cobourg's East Pier Repair Options link
Waterfront Plan: East Pier has finished this stage
To provide the public with balanced and objective information to assist in understanding the problems, alternatives and/or solutions.
Inform
Waterfront Plan: East Pier has finished this stage
To provide the public with balanced and objective information to assist in understanding the problems, alternatives and/or solutions.
Consult
Waterfront Plan: East Pier has finished this stage
To obtain public feedback on analysis, alternatives and/or decisions.
Consult
Waterfront Plan: East Pier has finished this stage
To obtain public feedback on analysis, alternatives and/or decisions.
Involve
Waterfront Plan: East Pier has finished this stage
The final outcomes of the consultation are documented here and may include a summary of all contributions collected as well as recommendations for future action.
Involve
Waterfront Plan: East Pier is currently at this stage
The final outcomes of the consultation are documented here and may include a summary of all contributions collected as well as recommendations for future action.
Collaborate
this is an upcoming stage for Waterfront Plan: East Pier
To partner with the public in each aspect of the decision, including the development of alternatives and the identification of preferred solution.
Collaborate
this is an upcoming stage for Waterfront Plan: East Pier
To partner with the public in each aspect of the decision, including the development of alternatives and the identification of preferred solution.
Empower
this is an upcoming stage for Waterfront Plan: East Pier
To place final decision-making in the hands of the public.
Empower
this is an upcoming stage for Waterfront Plan: East Pier
To place final decision-making in the hands of the public.